Test Name | Status | Notes | Modified |
---|---|---|---|
Board Status | 1 | Backplane connections badly bowed, care needed when inserting into crate. During original testing failed DRAM test top and bottom. With CGs new mig and ise 10.1 top and bottom both passed full DRAM test (27/05/08). | 22-07-2008 |
fuses | 1 | 18-06-2008 | |
U31 | 1 | 18-06-2008 | |
U32 | 1 | 18-06-2008 | |
U33 | 1 | 18-06-2008 | |
U34 | 1 | 18-06-2008 | |
U35 | 1 | 18-06-2008 | |
U81 | 1 | 18-06-2008 | |
U82 | 1 | 18-06-2008 | |
I5V_initial | 1 | 18-06-2008 | |
I3V initial | 1 | 18-06-2008 | |
proms load | 1 | 18-06-2008 | |
I5V proms | 1 | 18-06-2008 | |
I3V proms | 1 | 18-06-2008 | |
V4T temp | 1 | 18-06-2008 | |
V4B temp | 1 | 18-06-2008 | |
connectivity | 1 | 18-06-2008 | |
loop data | 1 | 18-06-2008 | |
slink | 1 | 18-06-2008 | |
dram | 1 | Top and bottom both fail with ffffffff.
With CGs new mig and ise 10.1 top and bottom both passed full DRAM test (27/05/08). | 18-06-2008 |
nse communication | 1 | 18-06-2008 | |
sram | 18-06-2008 | ||
optical loop | 1 | 18-06-2008 | |
patch panel | 1 | 18-06-2008 | |
qpll lock | 1 | 18-06-2008 | |
ttc connectivity | 1 | 18-06-2008 | |
test fifo | 1 | 18-06-2008 | |
ddr reset | 18-06-2008 | ||
assembly | 1 | 18-06-2008 |