rods»view/78

Status Summary for ROD ID 78

tickets

<<Prev | Next>>

Test NameStatusNotesModified
Board Status 1 Backplane connections badly bowed, care needed when inserting into crate. During original testing failed DRAM test top and bottom. With CGs new mig and ise 10.1 top and bottom both passed full DRAM test (27/05/08). 22-07-2008
fuses 1
18-06-2008
U31 1
18-06-2008
U32 1
18-06-2008
U33 1
18-06-2008
U34 1
18-06-2008
U35 1
18-06-2008
U81 1
18-06-2008
U82 1
18-06-2008
I5V_initial 1
18-06-2008
I3V initial 1
18-06-2008
proms load 1
18-06-2008
I5V proms 1
18-06-2008
I3V proms 1
18-06-2008
V4T temp 1
18-06-2008
V4B temp 1
18-06-2008
connectivity 1
18-06-2008
loop data 1
18-06-2008
slink 1
18-06-2008
dram 1
Top and bottom both fail with ffffffff. With CGs new mig and ise 10.1 top and bottom both passed full DRAM test (27/05/08).
18-06-2008
nse communication 1
18-06-2008
sram
18-06-2008
optical loop 1
18-06-2008
patch panel 1
18-06-2008
qpll lock 1
18-06-2008
ttc connectivity 1
18-06-2008
test fifo 1
18-06-2008
ddr reset
18-06-2008
assembly 1
18-06-2008