Status Summary for ROD ID 130

<<Prev | Next>>

Test NameStatusNotesModified
Board Status 1 Sent to Dorigo for NSE x-ray Both NSE replaced Tested in 104, 22/11/2013 28-10-2014
nse lookup 1
passed 1000 loops
22-11-2013
sram 1
Both halves pass
21-11-2013
nse communication 1
Both halves now pass after rework
21-11-2013
ttc connectivity 1
10-06-2011
assembly 1
10-06-2011
ddr reset 1
10-06-2011
test fifo 1
10-06-2011
qpll lock 1
10-06-2011
patch panel 1
10-06-2011
slink 1
10-06-2011
optical loop 1
10-06-2011
sram 0
both half failed
10-06-2011
nse communication 0
both halves failed
09-06-2011
dram 1
08-06-2011
loop data 1
08-06-2011
V4B temp 1
16-05-2011
V4T temp 1
16-05-2011
I3V proms 1
16-05-2011
I5V proms 1
16-05-2011
connectivity 1
16-05-2011
proms load 1
16-05-2011
I3V initial 1
16-05-2011
I5V_initial 1
16-05-2011
U82 1
16-05-2011
U81 1
16-05-2011
U35 1
16-05-2011
U34 1
16-05-2011
U33 1
16-05-2011
U32 1
16-05-2011
U31 1
16-05-2011
fuses 1
13-05-2011