Test Name | Status | Notes | Modified |
---|---|---|---|
Board Status | 0 | Replaced QPLL Crystal X3, now locks to TTC and internal. -AC 5/2/08 Still high, but works fine. -AC 4/30 5V current is too high (0.68 amps). During initial testing loop data test failed. With CGs new mig and ise 10.1 both top and bottom pass loop data (27/05/08 alex). After a reset of the TTC this ROD takes ~5 - 10 minutes to regain QPLL. Adam has possibly traced this to a fault on th 2.5 VCC line. April,2015: R11 (for 2.5V power line at the bottom) was a white color which looked different from the R11 of any other board, so the component was replaced. ZG2015April29: No VME connection to the board. J5 chain does not work. Loading VME via J4 does not help to bring life to VME. | 29-04-2015 |
fuses | 1 | 17-06-2008 | |
U31 | 1 | 17-06-2008 | |
U32 | 1 | 17-06-2008 | |
U33 | 1 | 17-06-2008 | |
U34 | 1 | 17-06-2008 | |
U35 | 1 | 17-06-2008 | |
U81 | 1 | 17-06-2008 | |
U82 | 1 | 17-06-2008 | |
I5V_initial | 1 | 17-06-2008 | |
I3V initial | 1 | 17-06-2008 | |
proms load | 1 | 17-06-2008 | |
I5V proms | 1 | 17-06-2008 | |
I3V proms | 1 | 17-06-2008 | |
V4T temp | 1 | 17-06-2008 | |
V4B temp | 1 | 17-06-2008 | |
connectivity | 1 | 17-06-2008 | |
loop data | 1 | All bits shifted by 1 and top byte is 00. -AC 5/2/08.
see sttlog108 for failed fifo test 5/14 BM.
With CGs new mig and ise 10.1 top and bottom pass, although the top has only been tested with 30k evts (27/05/08 alex). | 17-06-2008 |
slink | 1 | 17-06-2008 | |
dram | 1 | 17-06-2008 | |
nse communication | 1 | 17-06-2008 | |
sram | 17-06-2008 | ||
optical loop | 1 | 17-06-2008 | |
patch panel | 1 | 17-06-2008 | |
qpll lock | 1 | 17-06-2008 | |
ttc connectivity | 1 | 17-06-2008 | |
test fifo | 1 | 17-06-2008 | |
ddr reset | 17-06-2008 | ||
assembly | 1 | 17-06-2008 |